Taking shape

Work is moving on apace at Steelbank weir, the first lot of steels are in place which will form the actual pass, by the end of the week all the steels should be completed, ready for concrete to be poured.P1000851.JPG

It’s been a lovely day for being out and about on the river, I paid a visit to Brightside weir as work begins there too this week.  The bags of stone are ready to be used to dam off the flow of the river and dry the part of the weir to be worked on.

P1000857

Brightside Weir includes a concrete pipe which is apparently the outfall of the culverted Carbrook

P1000872

and just because it was a lovely day, here’s a picture of the Don at Brightside looking lovely with the water crowfoot in flower.

P1000861